INCLUDED IN THE PRICE ARE THE FOLLOWING:

  • Site Survey

  • Subfloor structure - galvanised steel purlin (joist) which eliminates the fear of subfloor deterioration over time due to wet or dry rot.

  • Very high insulation level to all elements of the structure.

  • Internal finish is plastered.

  • Laminate flooring fitted.

  • Choice of either c/h radiator or eco electric heater.

  • High quality Electric sockets switches and lights.

As standard all electrics are returned to an electrical enclosure unit and provision made for the ingress of a power source from the main dwelling through conduit in the frame of the structure.

Usually the client will engage an electrician to route a suitable cable to the garden unit but this service can be provided by us at an agreed price prior to commencement of the foundations.

Viewings of unit are by appointment only.

 

Price List

All units are priced individually as all units are bespoke built to the customer requirement.

A generic guide price per square meter would be circa €1,400 per square meter, with smaller units costing more per square meter and a reduction in cost for larger units.

A final price is reached after a site survey and an assessment of such criteria as location, site access, site preparation and transportation cost.

The number and size of doors and windows and the amount of cedar cladding are a factor affecting cost.

Generally if a unit dimensions and site access allow for a unit to be constructed completely off site and craned on to site by truck crane, then there is a cost reduction in the overall price.

 
 
 

Extras

 

PVC Window (variety of colour choice)

Double Glazed 1.7m High 0.7m Wide

€600

(all other sizes available and priced accordingly)

 

Toilet and Basin

€1100

 

Water/Meter*

€35

Partition Wall

For Toilet Unit

€1200

 

Shower Unit

€2200

 

Waste/Meter*

€50

 
 

*Water and waste provision available and can be agreed prior to commencement but as a guideline.

Routing of a mains electrical from the primary dwelling/building can be provided at an agreed cost.

Advice on any site clearance or preparation that needs to be undertaken by the customer will be given to the customer at site survey stage.

Site clearance can be undertaken by us and costs such as skip hire agreed prior to commencement.